NPRR1325  Related to PGRR145, Batch Zero Process for Large Load Interconnections

Approved Urgent sponsor ERCOT posted 2026-03-04 ercot.com
ReasonStrategic Plan Objective 1
Created2026-04-15
Approved2026-06-18
Sections Affected
2.12.23.2.53.9.13.10.7.3.1 (new)3.11.4.34.4.9.44.4.9.4.4 (new)6.5.7.36.5.7.1116.5.5 (new)23W (new)and 23X (new)
Summary
This Nodal Protocol Revision Request (NPRR) defines essential terminology related to the transitional Large Load interconnection process, the Batch Zero Process, and modifies the Regional Planning Group procedures to allow for a new category of projects that result from the Batch Zero Process.