NPRR #1317 · Revision Request
NPRR1317 Creation of Non-Settled Generator (NSG) and Clarification of the Types, Usage, and Registration of Distributed Generation
ReasonRegulatory requirements
Created2026-01-14
Sections Affected
1.61.6.52.12.23.1.4.33.1.5.13.6.23.8.13.8.73.8.93.10.7.23.14.13.14.1.83.14.1.93.14.1.103.14.1.193.14.4.13.156.5.5.210.2.210.2.310.3.2.116.516.5.116.5.1.116.5.216.5.323Cand 23U (new)
Summary
This NPRR clarifies the term “Distributed Generation” (DG) and, introduces the categories of “Distributed Generation,” which include: Unregistered Distributed Generator; Distribution Generation Resource; Settlement Only Distribution Energy Storage System; Settlement Only Distribution Generator; and Non-Settled Distribution Generator. This NPRR also clarifies the Resource registration process for Resource Entities. Additionally, this NPRR updates DG interconnection, registration, and reporting requirements to ensure consistency throughout the ERCOT System as it relates to DG.
Timeline
- Dec 19 '25
-
Jan 8 '26
Listed without action at 1 meeting
-
Jan 14 '26
PRS PRS MeetingPRSDeferred/Tabled Tabled Referred → ROS Referred → WMS“To table NPRR1317 and refer the issue to ROS and WMS” — Passed→ PRS for consideration
- Jan 16 '26
- Feb 2 '26
- Feb 4 '26
- Feb 5 '26
- Feb 11 '26
-
Feb 16 '26
Listed without action at 12 meetings (Feb 16 '26 – Apr 20 '26)
- May 6 '26
-
May 7 '26
Listed without action at 9 meetings (May 7 '26 – Jun 22 '26)
- Jul 8 '26
-
Jul 9 '26
Listed without action at 4 meetings (Jul 9 '26 – Aug 6 '26)