NPRR #1284 · Revision Request
NPRR1284 Guaranteed Reliability Load Process
ReasonStrategic Plan Objective 1
Created2025-06-11
Sections Affected
2.12.23.11.7 (new)3.11.7.1 (new)3.11.7.2 (new)3.11.7.3 (new)3.11.7.4 (new)3.11.7.5 (new)and 23T (new)
Summary
This Nodal Protocol Revision Request (NPRR) creates a “bridging solution” where Loads that are willing to be contractually bound to curtail all or a part of their Load or self-provide their Load from backup generation during certain conditions, will be allowed to have that action considered as a “Manual System Adjustment” when the Load is studied under Planning Guides Sections 4.1.1.2, Reliability Performance Criteria, and Section 4.1.1.8, Maintenance Outage Reliability Criteria, for interconnection to the ERCOT grid. During the bridging period if conditions noted by the studies warrant, the Load will be instructed to curtail up to its contracted amount until the noted constraint is alleviated. The interconnection studies will also be performed with the Load considered firm to provide the full list of upgrades that will be performed. Once the upgrades are completed the Load will be released from this obligation.
Timeline
- May 12 '25
-
May 16 '25
Listed without action at 2 meetings (May 16 '25 – Jun 5 '25)
-
Jun 11 '25
PRS PRS MeetingPRSDeferred/Tabled Tabled Referred → ROS Referred → WMS“To table NPRR1284 and refer the issue to ROS and WMS” — Passed→ PRS for consideration
- Jul 9 '25
- Jul 10 '25
- Jul 16 '25
-
Jul 29 '25
Listed without action at 18 meetings (Jul 29 '25 – Nov 18 '25)
- Dec 3 '25
-
Dec 4 '25
Listed without action at 31 meetings (Dec 4 '25 – Jul 15 '26)
- ROS Meeting - Webex Only
- PRS Meeting
- CMWG Meeting - Webex Only
- PLWG Meeting
- WMS Meeting
- ROS Meeting
- PRS Meeting
- PLWG Meeting
- PLWG Meeting
- WMS Meeting
- ROS Meeting
- PRS Meeting
- WMS Meeting
- ROS Meeting
- PLWG Meeting - Webex Only
- PRS Meeting
- WMS Meeting
- ROS Meeting
- PLWG Meeting
- PRS Meeting
- PRS Meeting
- ROS Meeting
- WMS Meeting
- PLWG Meeting
- WMS Meeting
- ROS Meeting
- PRS Meeting
- PLWG Meeting
- WMS Meeting - Webex Only
- ROS Meeting - Webex Only
- PRS Meeting
- Jul 21 '26
-
Aug 5 '26
Listed without action at 2 meetings (Aug 5 '26 – Aug 6 '26)