NPRR #1198 · Revision Request
NPRR1198 Congestion Mitigation Using Topology Reconfigurations
ReasonStrategic Plan Objective 2
Created2023-10-12
Approved2024-07-25
Sections Affected
23.10.7.4 and 6.5.1.1
Summary
This Nodal Protocol Revision Request (NPRR) defines Extended Action Plan (EAP), adds EAP as a type of Constraint Management Plan (CMP) suitable for managing congestion that is resolvable by Security-Constrained Economic Dispatch (SCED), and removes language limiting the application of EAPs to congestion issues for which there exists no feasible SCED. The related NOGRR258 proposes changes that add language to allow the use of EAPs to address congestion that is resolvable by SCED, adds guardrails to ensure that topology reconfiguration requests meet basic reliability and economic criteria, and defines the process for submission, review, and approval of EAPs. This NPRR and NOGRR258 leverage ERCOT’s existing CMP process to quickly mitigate critical transmission congestion impacts by establishing a scalable process for topology reconfiguration requests that is transparent, predictable, equitable, workable, reliable, and compatible with existing planning processes. ERCOT already leverages topology optimization in the CMP processes. Since NPRR529, Congestion Management Plan, was introduced in 2013 with the limitations that this NPRR proposes to revise, the power industry has evolved and there have been technological improvements that make transmission topology reconfigurations a powerful option to mitigate congestion beyond just use cases for which there is no feasible SCED solution.
Timeline
- Aug 31 '23
- Sep 7 '23
- Sep 21 '23
- Oct 5 '23
-
Oct 11 '23
Listed without action at 1 meeting
-
Oct 12 '23
PRS PRS MeetingPRSDeferred/Tabled Tabled Referred → ROS Referred → WMS“to table NPRR1198 and refer the issue to ROS and WMS” — Passed→ Language Consideration
- Oct 19 '23
- Nov 1 '23
- Nov 2 '23
- Nov 9 '23
-
Nov 14 '23
Listed without action at 10 meetings (Nov 14 '23 – Jan 11 '24)
- Jan 23 '24
-
Feb 1 '24
Listed without action at 6 meetings (Feb 1 '24 – Mar 7 '24)
- Mar 13 '24
-
Mar 20 '24
Listed without action at 1 meeting
- Apr 3 '24
- Apr 4 '24
-
Apr 5 '24
PRS PRS Meeting - Webex OnlyPRSRecommended for Approval Recommended for approval Amended by the Mar 8 '24 LCRA comments“to recommend approval of NPRR1198 as amended by the 3/8/24 LCRA comments” — Passed→ Impact Analysis Consideration
- May 2 '24
-
May 9 '24
PRS PRS MeetingPRSRecommended for Approval Recommended for approval Forwarded → TAC priority 2025 · rank 4520“to endorse and forward to TAC the 4/5/24 PRS Report and 4/30/24 Impact Analysis for NPRR1198 with a recommended priority of 2025 and rank of 4520” — Passed→ Revision Reques Consideration
-
May 22 '24
TAC TAC MeetingTACRecommended for Approval Recommended for approval“to recommend approval of NPRR1198 as recommended by PRS in the 5/9/24 PRS Report” — Passed→ Revision Request Consideration
- Jun 5 '24
-
Jun 18 '24
BOARD Board of Directors MeetingBOARDRecommended for Approval Recommended for approval“to recommend approval of NPRR1198 as recommended by TAC in the 5/22/24 TAC Report” — Passed→ Revision Request Consideration
-
Jul 25 '24
PUCTPUCTApproved Approved“to approve NPRR1198 and accompanying ERCOT Market Impact Statement as presented in Project No. 54445, Review of Protocols Adopted by the Independent Organization” — Passed
-
—
Posted since the last meeting