ERCOT·WATCH Search ercot.com  ⌕
NPRR #1193 · Revision Request

NPRR1193  Related to SMOGRR027, Move OBD to Settlement Metering Operating Guide – EPS Metering Design Proposal

Approved sponsor ERCOT posted 2023-08-09 ercot.com
ReasonGeneral system and/or process improvement(s)
Created2023-09-13
Approved2024-04-11
Sections Affected
10.4.2
Summary
This Nodal Protocol Revision Request (NPRR) changes the referenced location of the EPS Design Proposal Form, as it is moving from the Other Binding Document List into the Settlement Metering Operating Guide (SMOG).
Timeline