NPRR #1144 · Revision Request

NPRR1144  Station Service Backup Power Metering

Approved sponsor Plus Power posted 2022-07-27 ercot.com
ReasonMarket efficiencies or enhancements
Created2022-08-11
Approved2023-03-23
Sections Affected
10.3.2.3
Summary
This Nodal Protocol Revision Request (NPRR) provides a limited exception to the requirement that all loads included in the netting arrangement for an ERCOT-Polled Settlement (EPS) Metering Facility only be connected to the ERCOT Transmission Grid through the EPS metering point(s) for the Facility. The exception would allow no more than 500kW of auxiliary Load connected to a station service transformer to be connected to a Transmission Service Provider’s (TSP’s) or Distribution Service Provider’s (DSP’s) Facilities through a separately metered point using an open transition load transfer switch listed for emergency use.