NPRR #1100 · Revision Request
NPRR1100 Allow Generation Resources and Energy Storage Resources to Serve Customer Load When the Customer and the Resource are Disconnected from the ERCOT System
ReasonMarket efficiencies or enhancements
Created2021-11-10
Approved2022-07-14
Sections Affected
2.12.23.9.16.4.76.5.5.16.5.66.6.13(new)and 10.3.2.3
Summary
This Nodal Protocol Revision Request (NPRR) clarifies that a Generation Resource or Energy Storage Resource (ESR) may serve Customer Load in any circumstance in which the Customer and the Resource are both disconnected from the ERCOT System due to an Outage of the transmission or distribution system. It is limited to configurations where the Resource and Customer Load are using privately owned transmission and distribution infrastructure during the Private Microgrid Island (PMI) operation. This is not a Private Use Network and the Load and Resource do not net during normal circumstances. For PMIs with an ESR, after the initial Settlement of an Operating Day in which the private microgrid operated as a PMI, this NPRR proposes an adjustment to ensure that consumption by the ESR prior to the PMI operation period and subsequently used to serve the Customer during private microgrid operation is no longer treated as Wholesale Storage Load (WSL). This adjustment will recharacterize the Load from WSL to Non-WSL on an Operating Day basis for as many Operating Days as necessary to ensure that ESR Load not eligible for WSL treatment is not provided WSL treatment.
Timeline
- Oct 6 '21
-
Oct 26 '21
Listed without action at 1 meeting
-
Nov 10 '21
PRS PRS Meeting by Webex OnlyPRSDeferred/Tabled Tabled Referred → ROS Referred → WMS“To table NPRR1100 and refer the issue to ROS and WMS”→ PRS for consideration
-
Dec 1 '21
WMS WMS Meeting by Webex Only“To request PRS continue to table NPRR1100 for further discussion by MWG and WMWG”
- Dec 2 '21
- Dec 14 '21
-
Dec 16 '21
Listed without action at 2 meetings (Dec 16 '21 – Dec 17 '21)
- Jan 5 '22
-
Jan 6 '22
Listed without action at 7 meetings (Jan 6 '22 – Feb 9 '22)
- Feb 17 '22
-
Mar 2 '22
Listed without action at 4 meetings (Mar 2 '22 – Mar 24 '22)
- Apr 6 '22
-
Apr 7 '22
Listed without action at 1 meeting
-
Apr 14 '22
PRS PRS MeetingPRSDeferred/Tabled Urgent status Tabled“To grant NPRR1100 Urgent status; and to table NPRR1100” — Passed→ PRS for consideration
- Apr 21 '22
- May 4 '22
- May 5 '22
-
May 11 '22
PRS PRS MeetingPRSRecommended for Approval Recommended for approval Amended by the May 3 '22 ERCOT comments Forwarded → TAC“To recommend approval of NPRR1100 as amended by the 5/3/22 ERCOT comments; and to forward to TAC NPRR1100” — Passed→ TAC for consideration
-
May 25 '22
TAC TAC MeetingTACRecommended for Approval Recommended for approval Amended by the May 19 '22 Oncor comments“To recommend approval of NPRR1100 as recommended by PRS in the 5/11/22 PRS Report as amended by the 5/19/22 Oncor comments; and the 5/18/22 Impact Analysis with a proposed effective date of July 15, 2022” — Passed→ Board for consideration
-
Jun 21 '22
BOARD Board of Directors MeetingBOARDRecommended for Approval Recommended for approval“To recommend approval of NPRR1100 as recommended by TAC in the 5/25/22 TAC Report” — Passed→ PUCT for consideration
-
Jul 14 '22
PUCTPUCTApproved Approved“To approve NPRR1100 and accompanying ERCOT Market Impact Statement as presented in Project No. 52934, Review of Rules Adopted by the Independent Organization”
-
—