ERCOT·WATCH Search ercot.com  ⌕
NPRR #1019 · Revision Request

NPRR1019  Pricing and Settlement Changes for Switchable Generation Resources (SWGRs) Instructed to Switch to ERCOT

Approved Urgent sponsor ERCOT posted 2020-04-01 ercot.com
Created2020-04-20
Approved2020-06-09
Sections Affected
3.9.16.4.4.2 (delete)6.5.7.36.6.12and 6.6.12.1
Summary
This NPRR addresses the switching of Switchable Generation Resources (SWGRs) from a non-ERCOT Control Area to the ERCOT the Control Area. Specifically, this NPRR makes the following changes: • Proposes that ERCOT systems automatically create a proxy Energy Offer Curve with a price floor of $4,500/MWh for each Reliability Unit Commitment (RUC)-committed SWGR as opposed to requiring Qualified Scheduling Entities (QSEs) to submit Energy Offer Curves reflecting the $4,500/MWh floor. • Includes a lost revenue cost component to the Switchable Generation Cost Guarantee (SWCG) to ensure that Combined-Cycle Generation Resource SWGRs are made whole to their costs when switching from a non-ERCOT Control Area to the ERCOT Control Area.
Timeline