ERCOT·WATCH Search ercot.com  ⌕
NPRR #100 · Revision Request

NPRR100  PCRR Release Mechanism

Approved sponsor Trip Doggett on behalf of Texas Nodal Transition Plan Task Force (TPTF) posted 2008-01-14 next action Consideration ercot.com
ReasonERCOT proposes to remove the "release mechanism" language in the protocols as the existing CRR System design provides a more elegant solution. This revision is necessary to comport the Protocols with current CRR system design.
Created2008-02-21
Approved2008-04-15
Sections Affected
7.4.17.4.27.5.1 and 7.5.6.3
Summary
This Nodal Protocol Revision Request (NPRR) removes the Pre-Assigned Congestion Revenue Right (PCRR) release concept, replacing it with a process in which a fraction of the previously allocated or awarded CRRs are factored into the determination of available network capacity for a CRR auction.
Timeline