ERCOT·WATCH Search ercot.com  ⌕
NPRR #92 · Revision Request

NPRR092  Remove Voltage Schedules Requirement

Approved sponsor John Adams, ERCOT posted 2007-12-14 next action Consideration ercot.com
ReasonERCOT systems do not generate or receive voltage schedule data. ERCOT does not normally provide voltage set point instructions to generators. ERCOT has delegated this responsibility to Transmission Operators (TOs). In order for this data to be provided to the market, a separate tool will need to be built in order to access the information from the TOs.
Created2008-02-21
Approved2008-04-15
Sections Affected
6.5.7.1.13Data Inputs and Outputs for the Real-Time Sequence and SCED
Summary
This Nodal Protocol Revision Request (NPRR) will remove the requirement for ERCOT to post hourly voltage schedules on the MIS Secure Area.
Timeline