NPRR #81 · Revision Request
NPRR081 Automatic Voltage Regulator (AVR) Status
ReasonNERC Reliability Standard VAR-001-1, Requirements R4, R6 and R6.1 require the Transmission Operator to know the status of all transmission Reactive Power resources, including the status of AVRs on generators. In addition, NERC Reliability Standard VAR-002-1, to become effective 8/2/07, requires the Generator Operator to "…operate each generator connected to the interconnected transmission system in the automatic voltage control mode (automatic voltage regulator in service and controlling voltage)…" The requirement does not state that telemetry must be installed in order to be in compliance with this standard. However, installing telemetry which can be archived for historical and auditing purposes, provides a better tracking means than using ERCOT and participant logs. During the PRS discussion of PRR732, Automatic Voltage Regulator (AVR) Status -- Compliance with NERC Reliability Standards PRS agreed that telemetry would facilitate compliance with NERC requirements and will eliminate any question whether ERCOT has captured all data required by NERC. Market Participants and ERCOT agreed that Market Participants should be given sufficient time to install the telemetry technology and such a transition period will extend to the start of the Texas Nodal Market. Therefore, this issue should be addressed in the Nodal Protocols. This NPRR addresses this issue. Facilitates compliance to NERC Reliability Standards
Created2007-09-20
Approved2008-03-18
Sections Affected
3.15.3QSE Responsibilities Related to Voltage Support
Summary
This NPRR adds a requirement for telemetry of Generation Resource AVR status to comply with North American Electric Reliability Corporation (NERC) Reliability Standards.
Timeline
- Aug 31 '07
-
Sep 10 '07
Listed without action at 1 meeting
-
Sep 20 '07
PRS PRS MeetingPRSRecommended for Approval Recommended for approval“To recommend approval of NPRR081 as revised by TPTF and PRS.” — Passed→ PRS review of the Recommendation Report and Impact Analysis
- Oct 18 '07
-
Nov 15 '07
PRS PRS MeetingPRSRecommended for Approval Forwarded → TAC“To forward the Recommendation Report and IA to TAC.” — Passed
-
Nov 29 '07
TAC TAC MeetingTACReferred Referred → ROS“To refer NPRR081 to ROS pending deliverables from the Power System Stabilizer (PSS) Task Force.” — Passed
- Jan 10 '08
-
Feb 14 '08
ROS ROS MeetingROS Recommended for approval“To submit comments recommending revised language.” — Passed→ TAC consideration of NPRR081
-
Mar 6 '08
TAC TAC MeetingTACRecommended for Approval Recommended for approval Amended by the ROS comments“To recommend approval as revised by ROS comments.” — Passed→ ERCOT Board consideration of NPRR081
-
Mar 18 '08
BOARD Board of Directors MeetingBOARDApproved Recommended for approval“Approve as recommended by TAC.” — Passed