NPRR #74 · Revision Request
NPRR074 Revisions to Monitoring and Qualification Tests in Section 8, Performance Monitoring and Compliance
ReasonIn the current zonal market design, both Responsive Reserve and Non-Spin are deployed as energy by the Load Frequency Control (LFC) system. As a result of Market Participant input, ERCOT Staff proposed to have LFC deploy only capacity in the nodal design and allow only SCED to deploy all RRS and Non-spin energy. This methodology is not consistent with the current monitoring and qualification methods described in Section 8.
Created2007-07-19
Sections Affected
8.2.2.18.1.2.2.38.1.2.2.48.1.2.3.28.1.2.4.18.1.2.4.28.1.2.4.3
Summary
This NPRR makes the testing and compliance requirements consistent with NPRR049, Generation Subsystem Changes to Incorporate Approved Whitepapers, and the white papers "Generation Resource Responsive Reserve Deployment and Recall" and "Non-Spin Deployment Notification and Availability" approved by TPTF located at http://nodal.ercot.com/docs/pd/mms/index.html#oth.
Timeline
- Jun 19 '07
-
Jun 21 '07
Listed without action at 2 meetings (Jun 21 '07 – Jun 25 '07)
-
Jul 19 '07
PRS PRS MeetingPRSReferred Referred → TPTF“To refer NPRR074 to TPTF.” — Passed→ Language consideration
- Aug 13 '07
-
Aug 27 '07
Listed without action at 2 meetings (Aug 27 '07 – Sep 10 '07)
-
Sep 20 '07
PRS PRS MeetingPRSWithdrawn Withdrawal“On 9/20/07, PRS voted unanimously to affirm the request for withdrawal of NPRR074. All Market Segments were present.” — Passed
- Oct 5 '07