NOGRR #287 · Revision Request

NOGRR287  Load Shed Provisions to Identify and Minimize Overlap of Essential Loads

Pending sponsor ERCOT posted 2026-04-22 sits at BOARD next action Consideration then to PUCT ercot.com
ReasonRegulatory requirements
Created2026-05-07
Sections Affected
4.5.3.4 and 8L
Summary
This Nodal Operating Guide Revision Request (NOGRR) establishes guidelines for Transmission Operators (TOs) and Transmission and/or Distribution Service Providers (TDSPs) to collaborate in identifying and prioritizing critical natural gas infrastructure Loads essential for the reliability of the ERCOT System. Furthermore, this NOGRR outlines provisions for TOs and TDSPs to minimize overlaps between circuits designated for manual Load shedding, Under-Voltage Load Shedding (UVLS), and Under-Frequency Load Shedding (UFLS), and those circuits identified as critical Loads necessary for maintaining reliability of the ERCOT System.