NOGRR #287 · Revision Request
NOGRR287 Load Shed Provisions to Identify and Minimize Overlap of Essential Loads
ReasonRegulatory requirements
Created2026-05-07
Sections Affected
4.5.3.4 and 8L
Summary
This Nodal Operating Guide Revision Request (NOGRR) establishes guidelines for Transmission Operators (TOs) and Transmission and/or Distribution Service Providers (TDSPs) to collaborate in identifying and prioritizing critical natural gas infrastructure Loads essential for the reliability of the ERCOT System. Furthermore, this NOGRR outlines provisions for TOs and TDSPs to minimize overlaps between circuits designated for manual Load shedding, Under-Voltage Load Shedding (UVLS), and Under-Frequency Load Shedding (UFLS), and those circuits identified as critical Loads necessary for maintaining reliability of the ERCOT System.
Timeline
- Apr 22 '26
-
May 7 '26
ROS ROS MeetingROSRecommended for Approval Recommended for approval“to recommend approval of NOGRR287 with a proposed effective date of no earlier than 4/1/27” — Passed→ Impact Analysis Consideration
-
Jun 4 '26
ROS ROS MeetingROSRecommended for Approval Recommended for approval Forwarded → TAC Amended by the Jun 1 '26 ERCOT comments“to endorse and forward to TAC the 5/7/26 ROS Report, as amended by the 6/1/26 ERCOT comments, and the 4/22/26 Impact Analysis for NOGRR287” — Passed→ Revision Request Consideration
-
Jul 29 '26
TAC TAC MeetingTACRecommended for Approval Recommended for approval“to recommend approval of NOGRR287 as recommended by ROS in the 6/4/26 ROS Report” — Passed→ Revision Request Consideration
-
—
Posted since the last meeting