NOGRR #258 · Revision Request
NOGRR258 Related to NPRR1198, Congestion Mitigation Using Topology Reconfigurations
ReasonStrategic Plan Objective 2
Created2023-10-05
Approved2024-07-25
Sections Affected
11.111.411.4.111.611.8 (new)and 11.8.1 (new)
Summary
This Nodal Operating Guide Revision Request (NOGRR) proposes changes to align the Nodal Operation Guides with NPRR1198 that adds language to allow the use of Remedial Action Plans (RAPs) and Extended Action Plans (EAPs) to facilitate the market use of the ERCOT Transmission Grid. NOGRR258 also adds guardrails to ensure that topology reconfiguration requests meet basic reliability and economic criteria, and defines the process for submission, review, and approval of EAPs. This NOGRR and NPRR1198 leverage ERCOT’s existing Constraint Management Plan (CMP) process to quickly mitigate critical transmission congestion impacts by establishing a scalable process for topology reconfiguration requests that is transparent, predictable, equitable, workable, reliable, and compatible with existing planning processes. ERCOT already leverages topology optimization in the CMP processes. Since NPRR529, Congestion Management Plan was introduced in 2013 with the limitations that NPRR1198 proposes to revise, the power industry has evolved and there have been technological improvements that make transmission topology reconfigurations a powerful option to mitigate congestion beyond just use cases for which there is no feasible Security-Constrained Economic Dispatch (SCED) solution.
Timeline
-
Aug 31 '23
ROSFiled by EDF Renewables, Inc.
-
Sep 7 '23
Listed without action at 2 meetings (Sep 7 '23 – Sep 21 '23)
-
Oct 5 '23
ROS ROS Meeting - Webex OnlyROSDeferred/Tabled Tabled Referred → OWG Referred → NDSWG“to table NOGRR258 and refer the issue to the Operations Working Group (OWG) and Network Data Support Working Group (NDSWG)” — Passed→ Language Consideration
- Oct 11 '23
-
Oct 19 '23
Listed without action at 1 meeting
- Nov 2 '23
- Nov 16 '23
-
Dec 5 '23
Listed without action at 3 meetings (Dec 5 '23 – Jan 8 '24)
- Jan 23 '24
-
Feb 1 '24
Listed without action at 1 meeting
- Feb 20 '24
-
Mar 7 '24
Listed without action at 1 meeting
- Mar 13 '24
-
Apr 4 '24
ROS ROS MeetingROSRecommended for Approval Recommended for approval Amended by the Mar 8 '24 LCRA comments“to recommend approval of NOGRR258 as amended by the 3/8/24 LCRA comments as revised by ROS” — Passed→ Impact Analysis Consideration
-
May 2 '24
ROS ROS Meeting - Webex OnlyROSRecommended for Approval Recommended for approval Forwarded → TAC“to endorse and forward to TAC the 4/4/24 ROS Report and the 4/30/24 Impact Analysis for NOGRR258” — Passed→ Revision Request Consideration
-
May 22 '24
TAC TAC MeetingTACRecommended for Approval Recommended for approval“to recommend approval of NOGRR258 as recommended by ROS in the 5/2/24 ROS Report” — Passed→ Revision Request Consideration
-
Jun 18 '24
BOARD Board of Directors MeetingBOARDRecommended for Approval Recommended for approval“to recommend approval of NOGRR258 as recommended by TAC in the 5/22/24 TAC Report” — Passed→ Revision Request Consideration
-
Jul 25 '24
PUCTPUCTApproved Approved“to approve NOGRR258 and accompanying ERCOT Market Impact Statement as presented in Project No. 54445, Review of Protocols Adopted by the Independent Organization”
-
—
Posted since the last meeting