ERCOT·WATCH Search ercot.com  ⌕
NOGRR #256 · Revision Request

NOGRR256  Related to NPRR1191, Registration, Interconnection, and Operation of Customers with Large Loads; Information Required of Customers with Loads 25 MW or Greater

Withdrawn sponsor ERCOT posted 2023-08-01 next action Consideration ercot.com
ReasonStrategic Plan Objective 1
Created2023-09-07
Sections Affected
2.11 (new)4.5.3.14.5.3.4 (new)and 4.5.3.4
Summary
This Nodal Operating Guide Revision Request (NOGRR) establishes voltage ride-through requirements for Large Loads and Load-shedding processes for Large Loads that are registered as Registered Curtailable Loads.
Timeline