NOGRR #247 · Revision Request
NOGRR247 Change UFLS Stages and Load Relief Amounts
ReasonAddresses current operational issues
Created2023-03-02
Approved2023-10-12
Sections Affected
2.6.1
Summary
This Nodal Operating Guide Revision Request (NOGRR) modifies the ERCOT automatic Under-Frequency Load Shed (UFLS) program by increasing the number of Load shed stages from three to five and changing the Transmission Operator (TO) Load relief amounts to uniformly increment by 5% for each stage. The NOGRR also adds a UFLS minimum time delay of six cycles (0.1 seconds), and adds 59.1 Hz to the list of UFLS stages in paragraph (3) of Section 2.6.1. Additionally, this NOGRR revises the grey-box language from NOGRR226 in Section 2.6.1 to provide that the TO Load value used to determine the TO Load at each frequency threshold in Table 1 will be the value of TO Load at the time frequency reaches 59.5 Hz, rather than the value of TO Load at the time of reaching each successive frequency threshold, consistent with the current method for determining TO Load in Table 1, and proposes an effective date of October 1, 2026 for both NOGRR226 and NOGRR247.
Timeline
- Feb 15 '23
-
Mar 2 '23
ROS ROS MeetingROSDeferred/Tabled Tabled Referred → DWG Referred → OWG Referred → PDCWG Referred → SPWG“To table NOGRR247 and refer the issue to the Dynamics Working Group (DWG), Operations Working Group (OWG), Performance, Disturbance, Compliance Working Group (PDCWG), and System Protection Working Group (SPWG)” — Passed→ ROS for consideration
- Mar 16 '23
-
Mar 22 '23
Listed without action at 3 meetings (Mar 22 '23 – Apr 20 '23)
- May 4 '23
-
May 18 '23
Listed without action at 1 meeting
-
Jun 8 '23
ROS ROS MeetingROSRecommended for Approval Recommended for approval Amended by the Apr 27 '23 CenterPoint Energy comments“To recommend approval of NOGRR247 as amended by the 4/27/23 CenterPoint Energy comments.” — Passed→ ROS for Impact Analysis for consideration
-
Jul 6 '23
ROS ROS Meeting - Webex OnlyROSRecommended for Approval Recommended for approval Forwarded → TAC“To endorse and forward to TAC the 6/8/23 ROS Report and 2/15/23 Impact Analysis for NOGRR247” — Passed→ TAC for consideration
-
Jul 25 '23
TAC TAC Meeting - Webex OnlyTACRecommended for Approval Recommended for approval“To recommend approval of NOGRR247 as recommended by ROS in the 7/6/23 ROS Report” — Passed→ Board for consideration
-
Aug 31 '23
BOARD Board of Directors MeetingBOARDRecommended for Approval Recommended for approval“To recommend approval of NOGRR247 as recommended by TAC in the 7/25/23 TAC Report” — Passed→ PUCT for consideration
-
Oct 12 '23
PUCTPUCTApproved Approved“To approve NOGRR247 and accompanying ERCOT Market Impact Statement as presented in Project No. 54445, Review of Rules Adopted by the Independent Organization” — Passed
-
—
Posted since the last meeting