NOGRR245  Inverter-Based Resource (IBR) Ride-Through Requirements

Approved Urgent sponsor ERCOT posted 2023-01-11 ercot.com
ReasonStrategic Plan Objective 1
Created2023-02-08
Approved2024-09-26
Sections Affected
2.6.22.6.2.12.6.2.1 (new) 2.6.2.1.1 (new)2.6.4 (new)2.92.9.12.9.1.1 (new)2.9.1.2 (new)2.11 (new)2.11.1(new)2.11.2 (new) 2.12 (new)2.12.1 (new)2.12.1.1 (new)2.12.1.2 (new) 2.12.1.3 (new)and 2.13 (new)
Summary
This Nodal Operating Guide Revision Request (NOGRR) replaces the current voltage ride-through requirements for Intermittent Renewable Resources (IRRs) with voltage ride-through requirements for Inverter-Based Resources (IBRs) and Type 1 and Type 2 Wind-powered Generation Resources (WGRs) and provides new frequency ride-through requirements for IBRs and Type 1 and 2 WGRs consistent with or beyond requirements identified in the new 2800-2022 - Institute of Electrical and Electronics Engineers (IEEE) Standard for Interconnection and Interoperability of Inverter-Based Resources (IBRs) Interconnecting with Associated Transmission Electric Power Systems (“IEEE 2800-2022 standard”).
Timeline