NOGRR #234 · Revision Request

NOGRR234  Related to NPRR1098, Direct Current Tie (DC Tie) Reactive Power Capability Requirements

Approved sponsor ERCOT posted 2021-09-29 ercot.com
ReasonRegulatory requirements
Created2021-11-04
Approved2022-03-31
Sections Affected
2.7.22.7.3.3and 2.7.3.6 (new)
Summary
This Nodal Operating Guide Revision Request (NOGRR) revises the Nodal Operating Guide to be consistent with the Reactive Power capability requirements for Direct Current Ties (DC Ties) proposed by NPRR1098. A new Section 2.7.3.6, DCTO Responsibilities and DC Tie Requirements, is proposed to specify Direct Current Tie Operator (DCTO) responsibilities relative to Real-Time operational voltage control.
Timeline