ERCOT·WATCH Search ercot.com  ⌕
NOGRR #233 · Revision Request

NOGRR233  Related to NPRR1094, Allow Under Frequency Relay Load to be Manually Shed During EEA3

Approved sponsor Oncor posted 2021-09-01 ercot.com
ReasonAddresses current operational issues
Created2021-10-07
Approved2021-12-16
Sections Affected
2.6.1
Summary
This Nodal Operating Guide Revision Request (NOGRR) will allow a Transmission Operator (TO) and a Transmission and/or Distribution Service Provider (TDSP) to manually shed Load connected to under-frequency relays during an Energy Emergency Alert Level 3 (EEA3) if the affected TO can meet its overall Under-Frequency Load Shed (UFLS) requirement in Section 2.6.1 and its Load shed obligation under Section 4.5.3.4.
Timeline