NOGRR #190 · Revision Request
NOGRR190 Related to NPRR937, Distribution Voltage Level Block Load Transfer (BLT) Deployment
ReasonAddresses current operational issues, Regulatory requirements
Created2019-07-11
Sections Affected
4.5.3.4
Summary
This Nodal Operating Guide Revision Request (NOGRR) would allow distribution voltage level Block Load Transfer (BLT) firm Load deployed in Energy Emergency Alert (EEA) Level 2 to count toward the appropriate Transmission Service Provider’s (TSP’s) or Distribution Service Provider’s (DSP’s) firm Level 3 Load shed obligations under EEA Level 3.
Timeline
-
Apr 26 '19
ROSFiled by Golden Spread Electric Cooperative
-
Jul 11 '19
ROS ROS MeetingROSDeferred/Tabled Tabled Referred → OWG“to table NOGRR190 and refer the issue to the Operations Working Group (OWG)” — Passed→ Language Consideration
- Jul 25 '19
- Aug 8 '19
-
Aug 22 '19
Listed without action at 5 meetings (Aug 22 '19 – Dec 5 '19)
- Jan 9 '20