NOGRR #150 · Revision Request
NOGRR150 Alignment with NPRR747, Revision of Voltage Control Requirements
ReasonAddresses current operational issues
Created2015-12-15
Sections Affected
2.2.52.2.102.72.7.12.7.32.7.3 (new)2.7.3.1 (new)2.7.3.2 (new)2.7.3.3 (new)2.7.3.4 (new)2.7.3.5 (new)2.7.42.7.4.12.7.4.22.7.4.33.79.1.99.3.19.3.9
Summary
This Nodal Operating Guide Revision Request (NOGRR) relocates language concerning voltage support obligations that currently resides in an ERCOT procedure document but that should be moved to the Operating Guide so that the requirements are recognized as binding. Based in part on discussions at the April 8, 2015 Voltage Workshop, this NOGRR also allocates each of various voltage support responsibilities to the appropriate Entity. Additionally, this NOGRR clarifies that the ERCOT Transmission Operator (TO) has the authority to instruct a Qualified Scheduling Entity (QSE) to modify its Generation Resource’s Voltage Set Point. Additional edits are intended to better synchronize language with the North American Electric Reliability Corporation (NERC) Reliability Standards.
Timeline
- Nov 25 '15
-
Dec 15 '15
OWGEmail Vote / Unlisted MeetingOWGDeferred/Tabled Tabled“To table NOGRR150 for one month.” — Passed→ Language Consideration
-
Jan 26 '16
OWG OWG MeetingOWGDeferred/Tabled Tabled“To table NOGRR150 for one month” — Passed→ Language Consideration
-
Feb 18 '16
OWG OWG MeetingOWGDeferred/Tabled Tabled“To table NOGRR150 for one month” — Passed→ Language Consideration
- Mar 24 '16
-
Apr 22 '16
OWG OWG MeetingOWGDeferred/Tabled Tabled“To table NOGRR150 for one month” — Passed→ Language Consideration
-
May 19 '16
OWG OWG MeetingOWGRecommended for Approval Recommended for approval Amended by the Apr 21 '16 ERCOT comments“To recommend approval of NOGRR150 as amended by the 4/21/16 ERCOT comments as revised by OWG” — Passed→ OWG for Impact Analysis review
-
Jun 23 '16
OWG OWG MeetingOWGRecommended for Approval Recommended for approval Forwarded → ROS“To endorse and forward to ROS the 5/19/16 OWG Report and the Impact Analysis for NOGRR150” — Passed→ ROS for consideraton
-
Jul 7 '16
ROS ROS MeetingROSRecommended for Approval Recommended for approval Amended by the Jun 23 '16 OWG comments Amended by the ROS comments“To recommend approval of NOGRR150 as recommended by OWG in the 6/23/16 OWG Report as revised by ROS” — Passed→ TAC for consideration
- Jul 28 '16
-
Aug 25 '16
TAC TAC MeetingTACApproved Recommended for approval“To approve NOGRR150 as recommended by ROS in the 7/7/16 ROS Report” — Passed
-
—
Posted since the last meeting