NOGRR #149 · Revision Request
NOGRR149 Revision to Definition of Transmission Operator
ReasonAddresses current operational issues and regulatory requirements.
Created2015-12-15
Rejected2018-04-10
Sections Affected
1.4
Summary
This Nodal Operating Guide Revision Reqeust (NOGRR) revises the definition of “Transmission Operator” to establish a “Bright Line” threshold (annual peak MW) below which a Distribution Service Provider (DSP) owning no transmission or generation facilities, and who is not provided or offered Transmission Operator (TO) services from their incumbent Transmission Service Provider (TSP) or wholesale power supplier, would be exempted from having to procure designated TO services from a third-party provider. The “Bright Line” threshold being recommended is 25 MW.
Timeline
- Nov 11 '15
-
Dec 15 '15
OWGEmail Vote / Unlisted MeetingOWGDeferred/Tabled Tabled“To table NOGRR149 for one month.” — Passed→ Language Consideration
-
Jan 26 '16
OWG OWG MeetingOWGRecommended for Rejection Rejected“To recommend rejection of NOGRR149.” — Passed→ Revision Request Consideration
-
Mar 3 '16
ROS ROS MeetingROSRejected Appeal Rejected“To reject the 2/1/16 Schneider Engineering, LTD appeal and to reject NOGRR149” — Passed
-
Mar 31 '16
TAC TAC MeetingTACDeferred/Tabled Tabled Appeal“To table the 3/10/16 SPPG appeal for one month.” — Passed→ Consideration of Appeal
-
Apr 28 '16
TAC TAC MeetingTACDeferred/Tabled Tabled Appeal“To table the 3/10/16 SPPG appeal for one month and request the interconnecting TSPs continue discussions with affected MOUs, providing the following list of questions to be addressed: 1. How many feeders? 2. What substations are the feeders connected to? 3. Who owns the substations, and does the MOU have access to the substation? 4. Who supplies the power for the municipality? 5. Who offered (at whatever price) to provide TO services? 6. What was the price range? Fixed cost? One-time upgrades? Annual? 7. Cost recover mechanism for TO charges? 8. SCADA/sectionalizing feeders? 9. Is there a potential market solution?” — Passed→ Consideration of Appeal
-
May 26 '16
TAC TAC MeetingTACDeferred/Tabled Tabled Appeal“To table the 3/10/16 SPPG appeal for two months.” — Passed→ Consideration of Appeal
-
Jul 28 '16
TAC TAC MeetingTACDeferred/Tabled Tabled Appeal“To table the 3/10/16 SPPG appeal.” — Passed→ Consideration of Appeal
-
Sep 29 '16
TAC TAC MeetingTACDeferred/Tabled Tabled Appeal“To table the 3/10/16 SPPG appeal until the December 1, 2016 TAC meeting.” — Passed→ Consideration of Appeal
-
Dec 1 '16
TAC TAC MeetingTACDeferred/Tabled Tabled Appeal“To table the 3/10/16 SPPG appeal until the 1/26/17 TAC meeting.” — Passed→ Consideration of Appeal
-
Jan 26 '17
TAC TAC MeetingTACDeferred/Tabled Tabled Appeal“To table the 3/10/16 SPPG appeal until the 8/24/17 TAC meeting.” — Passed→ Consideration of Appeal
- Mar 23 '17
- May 25 '17
- Jul 27 '17
-
Aug 24 '17
TAC TAC MeetingTACDeferred/Tabled Tabled Appeal“To table the 3/10/16 SPPG appeal until the February 2018 TAC meeting.” — Passed→ Consideration of Appeal
- Sep 28 '17
- Nov 30 '17
- Jan 25 '18
- Feb 22 '18
-
Apr 10 '18
BOARD Board of Directors MeetingBOARDRejected Rejected Appeal“Reject the 3/6/18 SPPG appeal.” — Passed
-
—
Posted since the last meeting