NOGRR #132 · Revision Request
NOGRR132 Automatic Under-Voltage and Under-Frequency Load Shedding Protection Systems --Load Restoration
ReasonParagraph (4) of Section 11.4, Mitigation Plan, states, "Restoration of any Load shed by executing the Mitigation Plan shall be coordinated with ERCOT." To improve reliability of the ERCOT System, ERCOT proposes similar language in Section 6.2.6.3.6 to provide a reasonable level of assurance that Load restoration will not exceed capability limits of Generation Resources or Transmission Facilities. Additionally, ERCOT proposes to use similar language in Paragraph (5) of Section 2.6.1 for consistency and clarity that coordination is expected for any of the Load shed restoration with UFLS, UVLS, or Constraint Management Plans with Load shed.
Created2014-06-25
Sections Affected
2.6.16.2.6.3.6
Summary
Adds a requirement for Under-Frequency Load Shedding (UFLS) and Under-Voltage Load Shedding (UVLS) systems Load restoration coordination consistent with that of manually shed Load for EEA 3 or a Constraint Management Plan.
Timeline
- May 13 '14
- Jun 25 '14
-
Jul 22 '14
OWG OWG MeetingOWGRecommended for Approval Recommended for approval“To recommend approval of NOGRR132 as submitted.” — Passed→ OWG for IA review.
-
Aug 19 '14
OWG OWG MeetingOWGRecommended for Approval Recommended for approval Forwarded → ROS“To endorse and forward the 7/22/14 OWG Report and Impact Analysis for NOGRR132 to ROS.” — Passed→ ROS for consideration.
- Sep 4 '14
-
Sep 24 '14
Listed without action at 1 meeting
-
Oct 6 '14
ROS Joint ROS/WMS MeetingROSDeferred/Tabled Tabled“To table NOGRR132.” — Passed→ ROS for consideration.
- Oct 30 '14
-
Jan 8 '15
ROS ROS MeetingROSRemanded Remanded → OWG“To remand NOGRR132 to OWG for further review.” — Passed→ OWG for consideration
-
Jan 26 '15
OWG OWG MeetingOWGRecommended for Approval Recommended for approval Forwarded → TAC Amended by the Jan 22 '15 CNP comments“To endorse and forward NOGRR132 as amended by the 1/22/15 CNP comments and revised by OWG and the associated Impact Analysis.” — Passed→ Revision Request Consideration
-
Feb 5 '15
ROS ROS MeetingROSRecommended for Approval Recommended for approval“To recommend approval of NOGRR132 as recommended by OWG in the 1/26/15 OWG Report.” — Passed→ Revision Request Consideration
-
Feb 26 '15
TAC TAC MeetingTACApproved Recommended for approval“To recommend approval of NOGRR132 as recommended by OWG in the 1/26/15 OWG Report.” — Passed
-
—
Posted since the last meeting