NOGRR #112 · Revision Request
NOGRR112 Synchronization with NPRR517, Revisions to the Telemetry Standards and State Estimator Standards Approval Process
ReasonTo allow for a more efficient approval process for the Telemetry Standards and State Estimator Standards by revising the requirement for an annual update to an as needed basis. The State Estimator Standards and Telemetry Standards will also be updated to align with this change.
Created2013-04-17
Sections Affected
7.2.27.37.3.47.3.57.49.1.39.2.2
Summary
This Nodal Operating Guide Revision Request (NOGRR) synchronizes the Nodal Operating Guide with revisions proposed by Nodal Protocol Revision Request (NPRR) 517 which revises the approving body for the Telemetry Standards from TAC to the appropriate TAC Subcommittee (ROS in this case) and revises the requirement for an annual update to an annual review.
Timeline
- Apr 2 '13
-
Apr 17 '13
OWG Operations Working Group (OWG) MeetingsOWGRecommended for Approval Recommended for approval Amended by the OWG comments“Consensus to recommend approval of NOGRR112 as revised by OWG”→ OWG Impact Analysis Review
-
May 15 '13
OWG Operations Working Group (OWG) MeetingsOWGRecommended for Approval Recommended for approval Forwarded → ROS“Consensus to endorse and forward the 4/17/13 OWG Report and the Impact Analysis for NOGRR112 to ROS”
-
Jun 13 '13
ROS Reliability and Operations Subcommittee (ROS) MeetingROSRecommended for Approval Recommended for approval“To recommend approval of NOGRR112 as recommended by OWG in the 5/15/13 OWG Report” — Passed→ TAC Consideration
-
Jul 2 '13
TAC Technical Advisory Comittee (TAC) MeetingTACDeferred/Tabled Tabled“To table NOGRR112” — Passed→ TAC Consideration
-
Sep 5 '13
TAC Technical Advisory Committee (TAC) MeetingTACApproved Recommended for approval“To approve NOGRR112 as recommended by ROS in the 6/13/13 ROS Report” — Passed
-
—
Posted since the last meeting