NOGRR #106 · Revision Request

NOGRR106  Delegation of Firm Load Shedding Responsibility

Withdrawn sponsor Bryan Texas Utilities posted 2012-10-30 ercot.com
ReasonThe Transmission Service Provider (TSP) to which a DSP is physically connected and to which of necessity the Transmission Operator (TO) function is associated may not be in a position to perform the firm Load shed responsibility of the DSP.
Created2012-11-14
Sections Affected
2.6.14.5.3
Summary
This Nodal Operating Guide Revision Request (NOGRR) clarifies that a Distribution Service Provider (DSP) may make an agreement with another Entity that delegates the responsibility for managing both automatic and Energy Emergency Alert (EEA) firm Load shed.