NOGRR #106 · Revision Request
NOGRR106 Delegation of Firm Load Shedding Responsibility
ReasonThe Transmission Service Provider (TSP) to which a DSP is physically connected and to which of necessity the Transmission Operator (TO) function is associated may not be in a position to perform the firm Load shed responsibility of the DSP.
Created2012-11-14
Sections Affected
2.6.14.5.3
Summary
This Nodal Operating Guide Revision Request (NOGRR) clarifies that a Distribution Service Provider (DSP) may make an agreement with another Entity that delegates the responsibility for managing both automatic and Energy Emergency Alert (EEA) firm Load shed.
Timeline
- Oct 30 '12
-
Nov 14 '12
OWG Operations Working Group (OWG) MeetingOWGDeferred/Tabled Tabled“Consensus to table NOGRR106.” — Passed
- Dec 19 '12
- Jan 10 '13