NOGRR #99 · Revision Request
NOGRR099 SPS Procedure Changes for Consistency with NERC Reliability Standards
ReasonRecent changes to North American Electric Reliability Corporation (NERC) Reliability Standard PRC-004-2a, Analysis and Mitigation of Transmission and Generation Protection System Misoperations, requires the Regional Entity (Texas RE), not ERCOT, to monitor protection systems affecting the ERCOT Transmission Grid.
Created2012-06-13
Sections Affected
6.2.26.2.38B
Summary
This Nodal Operating Guide Revision Request (NOGRR) removes the Protection System Misoperation Report format and procedural references and adds references to reporting per Texas RE procedure(s).
Timeline
- May 30 '12
-
Jun 13 '12
OWG Operations Working Group (OWG) MeetingOWGRecommended for Approval Recommended for approval Amended by the Jun 11 '12 Oncor comments“Consensus to recommend approval as amended by the 6/11/12 Oncor comments”→ ROS Consideration
-
Jun 14 '12
ROS Reliability and Operations Subcommittee (ROS) MeetingROSRecommended for Approval Recommended for approval“To recommend approval of NOGRR099 as recommended by OWG in the 6/13/12 OWG Report” — Passed→ TAC Consideration
-
Jun 28 '12
TAC Technical Advisory Committee (TAC) MeetingTACDeferred/Tabled Tabled“To table NOGRR099” — Passed→ TAC Consideration
- Aug 14 '12
-
Sep 7 '12
TAC Technical Advisory Committee (TAC) MeetingTACWithdrawn Withdrawal“To approve the Request for Withdrawal for NOGRR099” — Passed
-
—
Posted since the last meeting