ERCOT·WATCH Search ercot.com  ⌕
NOGRR #73 · Revision Request

NOGRR073  Entity Responsible for Load Shed During EEA Level 3

Withdrawn sponsor Frank Owens on Behalf of Nodal Protocol and Guides Resolution Task Force (NPGRTF) posted 2011-05-17 ercot.com
ReasonThis NOGRR identifies the Entity responsible for Load shed during an EEA Level 3 event within the Operating Guides and aligns the relevant Operating Guide language with North American Electric Reliability Corporation (NERC) Reliability Standard EOP-003, Load Shedding Plans, and paragraph (4)(a) of Protocol Section 6.5.9.4.2, EEA Levels.
Created2011-06-15
Sections Affected
4.5.3.4
Summary
This Nodal Operating Guide Revision Request (NOGRR) clarifies who is responsible to shed Load during an Energy Emergency Alert (EEA) Level 3 event. This NOGRR also clarifies that ERCOT is responsible for directing Load shedding.
Timeline