NOGRR052 Conductor/Transformer Transmission Facility Rating
ReasonThe Requirement for Conductor/Transformer rating has been required by the Steady State Procedural Manual and is required for compliance with NERC Reliability Standard FAC-010, System Operating Limits Methodology for the Planning Horizon. Additionally, as the other three ratings are included in the Nodal Protocols and Nodal Operating Guides, the fourth rating should be included as well since the NMMS is used for all ratings submissions.
Created2010-10-20
Sections Affected
3.9.4
Summary
This NOGRR adds the Conductor/Transformer rating normally used as Rate C in the Annual Planning Models as a fourth Transmission facility rating required to be provided by Transmission Service Providers (TSPs).
Timeline
- Sep 9 '10
-
Oct 20 '10
OWG OWG MeetingOWGDeferred/Tabled Tabled“Consensus to table NOGRR052 for one month”→ OWG Language Consideration
-
Nov 18 '10
OWG OWG MeetingPRSRecommended for Approval Recommended for approval Amended by the Nov 17 '10 NDSWG comments“Consensus to recommend approval of NOGRR052 as amended by the 11/17/10 NDSWG comments”→ OWG IA Review
-
Dec 15 '10
OWG OWG MeetingOWGRecommended for Approval Recommended for approval Forwarded → ROS“Consensus to endorse and forward the 11/18/10 OWG Report and the Impact Analysis for NOGRR052 to ROS”→ ROS Consideration
-
Jan 13 '11
ROS ROS MeetingROSRecommended for Approval Recommended for approval“To recommend approval of NOGRR052 as recommended by OWG in the 12/15/10 OWG Report” — Passed→ TAC Consideration
- Feb 3 '11
- Mar 3 '11
-
Apr 7 '11
Listed without action at 2 meetings (Apr 7 '11 – May 5 '11)
-
Jun 2 '11
TAC TAC MeetingTACApproved Recommended for approval Amended by the Jan 24 '11 ERCOT comments“To approve NOGRR052 as amended by the 1/24/11 ERCOT comments” — Passed
-
—
Posted since the last meeting