NOGRR #32 · Revision Request
NOGRR032 Use of Consistent Rating Terminology
ReasonCurrently there are three defined ratings in the Nodal Protocols: Normal Rating, Emergency Rating, and 15-Minute Rating. Requirements for use of the three ratings are contained throughout the Nodal Protocols. In the Nodal Operating Guides there are three defined ratings: Continuous Rating, Emergency Rating, and 15-Minute Rating. Requirements for the use of these ratings are contained throughout the Nodal Operating Guides and are Nodal Operating Guide embodiments of the Nodal Protocol requirements for Normal Rating, Emergency Rating, and 15-Minute Rating, respectively. Additionally, there is a distinction between Transmission Facility and Transmission Element as it pertains to the Ratings definition. The use of the term Transmission Facility is more encompassing than the term Transmission Element. Per the Nodal Protocols, Ratings pertain to Transmission Elements. This NOGRR proposes a corresponding revision to the Nodal Operating Guides.
Created2010-01-18
Sections Affected
3.9.4
Summary
This Nodal Operating Guide Revision Request (NOGRR) proposes language changes to align rating terminology in the Nodal Operating Guides with the terminology in the Nodal Protocols. Utilization of the same verbiage helps alleviate communication issues and also removes the possible interpretation of additional rating requirements.
Timeline
- Dec 3 '09
-
Dec 15 '09
Listed without action at 1 meeting
-
Jan 18 '10
OWGEmail Vote / Unlisted MeetingOWGDeferred/Tabled Tabled“Consensus to table NOGRR032”→ OWG Language Consideration
-
Jan 19 '10
Listed without action at 1 meeting
-
Feb 19 '10
OWGEmail Vote / Unlisted MeetingOWGRecommended for Approval Recommended for approval“Consensus to recommend approval of NOGRR032 as submitted”→ OWG IA Review
-
Mar 17 '10
OWG OWG MeetingOWGRecommended for Approval Recommended for approval Forwarded → ROS“Consensus to endorse and forward the 2/19/10 OWG Recommendation Report and the Impact Analysis for NOGRR032 to ROS”→ ROS Consideration
-
Apr 12 '10
ROS ROS MeetingROSRecommended for Approval Recommended for approval“To recommend approval of NOGRR032 as recommended by OWG in the 3/17/10 OWG Recommendation Report” — Passed→ TAC Consideration
-
May 6 '10
TAC TAC MeetingTACApproved Recommended for approval“To approve NOGRR032 as recommended by ROS in the 4/12/10 ROS Recommendation Report” — Passed
-
—
Posted since the last meeting