NOGRR030 Synchronization -- Total Transmission Capacity Correction
ReasonTotal Transfer Capability, as defined by NERC, does not apply to the ERCOT Region since there is only one transmission system. Total Transmission Capacity is the comparable ERCOT terminology, but the two acronyms are used interchangeably throughout the ERCOT Nodal Operating Guides. This may cause ERCOT to appear to be out of compliance with NERC Reliability Standards, when compliance has actually been achieved, or the requirement is not applicable to ERCOT.
Created2009-09-10
Sections Affected
3.9.4
Summary
This Nodal Operating Guide Revision Request (NOGRR) replaces the acronym Total Transfer Capability (TTC) with Total Transmission Capacity (TTC).
Timeline
- Sep 3 '09
-
Sep 10 '09
ROS ROS MeetingROSRecommended for Approval Recommended for approval“To recommend approval of NOGRR030 as submitted” — Passed→ TAC Consideration
-
Oct 1 '09
TAC TAC MeetingTACApproved Recommended for approval Amended by the Sep 24 '09 ERCOT comments“To approve NOGRR030 as amended by the 9/24/09 ERCOT comments” — Passed
-
—