NOGRR026  Change the name of Emergency Electric Curtailment Plan (EECP) to Energy Emergency Alert (EEA) and Synchronization of EEA Steps with Protocols

Approved sponsor Colleen Frosch posted 2009-07-13 ercot.com
ReasonAligns the Nodal Operating Guides with the Nodal Protocols. This NOGRR changes Nodal Operating Guide language only and not procedure.
Created2009-08-19
Sections Affected
1.4Definitions 2.2.1Overview 2.2.9.2Time Synchronization 2.3Ancillary Services 2.6.1Automatic Firm Load Shedding 4.1Introduction 4.2.3Alert 4.4Block Load Transfers between ERCOT and Non-ERCOT System 4.5Emergency Electric Curtailment Plan (EECP) 4.5.1General 4.5.3Implementation 4.5.3.1General Procedures Prior to EECP Operations 4.5.3.2General Procedures During EECP Operations 4.5.3.3EECP Steps 4.5.3.5EECP Termination
Summary
This Nodal Operating Guide Revision Request (NOGRR) changes the name of the Emergency Electric Curtailment Plan (EECP) to Energy Emergency Alert (EEA), the defined term "Alert" to "Watch", and replaces "BtB" with "DC-Tie". This NOGRR also aligns the EEA Steps in the Nodal Operating Guides with the Nodal Protocols. The NOGRR deletes the definition of "Physical Responsive Capability (PRC)" since this term is already defined in the Nodal Protocols.