Meeting ·
Batch 1+ and Comprehensive Transmission Planning Workshop #2
LocationERCOT Austin 8000 Metropolis (Building E), Suite 100 Austin, TX 78744 Rooms A, B and C
VirtualWebEx / Teams
Dial-in877-668-4493
Agenda 26 items
- 1. Antitrust Admonition
- 2. Update on CTP/Batch1+
- 3. PUCT Project 58481 Update
- 4. Batch Study focus session:
- Review Batch Survey Results
- ERCOT Updates
- Handling of Project Changes
- Stability analysis and Batch process
- Short Circuit analysis and Batch process
- New stakeholder concepts for Batch
- Large-load-only network open season concept - Vistra (15 min)
- PCLR Market Design Topics (40 min)
- Independent PCLR entry through GINR Queue (Agentic) (10 min)
-
Conditional PCLR Base Point compliance (Agentic, Compute Heat Rate Project) (10 min)
- 4 - Mkt- CHR PCLR_9.21.26_Hans · Stakeholder Presentation
- Load Sponsored Generation (LSG) (Agentic) (10 min)
- PCLR in Netted Networks (Agentic) (10 min)
- Base Power Whitepaper (10 min)
- 5. Batch Reporting/transparency discussion
- 6. CTP focus session:
- Review CTP Survey Results
- ERCOT proposal of modified CTP sequence
- Discuss priorities based on survey results (near-term/long-term)
- 7. Discuss format and timing options for next meeting(s)
- Single combined meeting: Morning Batch session with afternoon Planning session
- Separate meetings: Dedicated Batch/BYOG/PCLR deep dive & Dedicated TSP planning deep dive
- 8. Adjourn
Documents 2
| Name | Doc Type | Type | Posted |
|---|---|---|---|
| 1 - ERCOT - CTP stakeholder workshop 2_09242026_v2 | Staff Report | pptx | Sep 24 '26 |
| 4- Mkt- Vistra_LL Open Season | Stakeholder Presentation | pptx | Sep 23 '26 |